Plant-e Projects - Berkel and Rodenrijs hose system
Categories
Plant-e portfolio
About this project

Along the N470 at Berkel en Rodenrijs, we installed the first large scale pilot with the Plant-e tubular system in 2015. As part of the sustainability of the provincial roads in the Province of Zuid-Holland, Plant-e was given the space and the budget to carry out the pilot. Due to modified plans with the renewal of the road, the installation had to be moved in its entirety in the summer of 2017. Fortunately, we were able to move it to a ditch at the NIOO in Wageningen so that measurements can be continued. These test results, together with those of the experiment in the Province of Noord-Brabant are indispensable for the R&D of the tubular system.