Plant-e installs demo at Wageningen UR

Posted by on Nov 9, 2016

Plant-e installs demo at Wageningen UR

Plant-e has installed a demo-installation on the Wageningen UR campus. It is the first installation of the tubular system in the Wageningen region. The new (water)garden at the campus, between the Atlas and Orion building, offers a place for experiments with new technologies and ideas. Plant-e now uses a plot toe test the tube system that makes it possible to generate electricity in wetlands. In...

Read More

Kick off Living Lab Plant-e, Budel

Posted by on Jul 21, 2016

Kick off Living Lab Plant-e, Budel

In March 2016 the Province of Noord-Brabant (The Netherlands) announced that they’ve made a subsidy available for a pilot test with Plant-e’s tubular system. The so called Living Lab had its festive kick off on the 14th of July 2016. Living Lab With help of the subsidy a part of the terrain of Nyrstar, a large zinc producing company, will be transformed from non-used (wet)land to...

Read More